Project: wcooper   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:William Cooper   -  
Project:   Vans - RV-10   -   VIEW REPORTS
Total Hours:29.5
Total Flight Time:
Total Expense:$175687.69
Start/Last Date:Jan 29, 2019 - No Finish Date
Engine:Lycoming YIO-540-D4A5 RT(Y)
Propeller:Hartzell C2YR-1BFP/F8068D
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=wcooper

Home or Last Project Picture

Mar 11, 2021     Baggage Door       Category: Fuselage
Jumped ahead a bit. Section 34, Baggage Door. Waiting for some help to rivet the Tailcone to the Fuse. So I thought that I would get to work on the Baggage Door. Match drilled and deburred and dimpled all the parts. Primed and it's pretty much ready to rivet. I purchased a lock and some door seal material. The lock latch was slightly long so used the belt sander to trim it to a better size. I need some help to help hold and stabilize the door to rivet it. I used a metal ruler with holes that I pre-drilled as a jig to drill holes in the piano hinge. Made drilling and spacing the holes very easy.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.